We were contacted by Shepherds Construction, who approached gocre8 via recommendation, as they were informed that we specialise in building wrap banners and installation. The job involved printing a 30m x 10m mesh banner and installing it on to the front of the Liverpool Library on the scaffold facia. The banner was printed in 6 separate sections then reinforced welded together to form one big banner. Working with both Shepherds and HTT Scaffold the job was a success from start to finish. The artwork was designed by Wash Design. We provided test prints for both Shepherds and Wash which enabled them to inspect the quality of the banner prior to installation.

Client:
Shepherds Construction

Project:
30m x 10m Mesh Building Wrap banner

Designed by:
Wash Design (Preston)

Printed and installed by:
go
cre8

Duration of project
Printed and installed within 6 days

Date of project
25/04/11

Location
Liverpool Library (William Brown Street, Liverpool City Centre)

Leave a Reply